Pole-mounted autonomous drone stations for urban defense, delivery infrastructure, and public safety. The American Tower of urban airspace.
We build and operate the physical infrastructure layer of UAE's urban airspace — starting with national defense, expanding into commercial delivery and public safety — under a 99-year concession that transforms every street light pole into a revenue-generating drone platform, at zero capital cost to the government.
$5K
Cost per intercept vs $1M Patriot
20,000
Poles across UAE at full deployment
99 yr
Exclusive infrastructure concession
$1.17B
Year 5 revenue projection
The Problem
Six Converging Crises, One Infrastructure Gap
The UAE faces an existential defense challenge and a generational infrastructure opportunity. No single existing solution addresses both.
Cost-Exchange Crisis
Shahed drone cost$50,000
Patriot missile cost$1,000,000
THAAD interceptor cost$12,000,000
Our intercept cost$5,000
Improvement200x cheaper
Coverage Gaps
Current defenseCentralized batteries
Protected areaPoint targets only
Our coverageEvery 300m (every 3rd pole)
Response timeUnder 20 seconds
March 2026 Reality
Hostile drones intercepted1,500+ in one campaign
DXB airportTotal shutdown
Jebel Ali portDirect hit
AWS data centerStruck
Shahed production rateHundreds per week
Infrastructure Void
Drone delivery infraNone on poles
Police drone responseNo launch network
Smart city sensorsGround-level only
Our solutionOne network, all uses
The Product
Two Housing Units, Infinite Applications
We don't build drones. We build the infrastructure that launches, lands, recharges, and redeploys them — from every street light pole and every rooftop in the UAE.
UAE Pole Infrastructure: Dubai has 80,000-120,000 viable street light poles. Standard galvanized steel, 8-12m tall, rated 50-150 kg tip load. Type B at 52 kg fits any standard pole.
Physics
Will a 5 kg Drone at 360 km/h Kill a Shahed?
Yes. Overwhelmingly. Here's the math.
25 kJ
Kinetic energy of 5 kg interceptor at 360 km/h
540 km/h
Head-on closing speed (interceptor + Shahed)
54.9 kJ
Head-on impact energy (5 kg interceptor)
>95%
Mission kill probability (head-on structural kill)
Key Formula: KE = ½ mv². At 100 m/s (360 km/h), a 5 kg interceptor carries 25,000 J — 39% more energy than a .50 caliber machine gun round (18,000 J). In a head-on collision at 540 km/h closing speed, the impact delivers 54,900 J — enough to shear a 50mm steel bar. The Shahed's composite airframe is far weaker.
Secondary effect from engine/fuel tank destruction
Bottom line: The interceptor doesn't need to make the Shahed explode — it needs to make it crash. At 55 kJ head-on impact, structural destruction is virtually guaranteed. Ukrainian combat data confirms: the Sting achieves 90% kill rates through structural damage. A distributed pole network guarantees head-on geometry (9x more energetic than tail chase).
Manufacturing
Global Supply Chain, Made in UAE
CNC aluminum from Shenzhen. Defense-grade sensors from USA. Final assembly at JAFZA Free Zone, Dubai. Zero import duty. Tawazun offset credit eligible.
Component
Source
Unit Cost
Lead Time
6061-T6 aluminum shell (hex, CNC)
CHINA Shenzhen
$850 ($550 at 1K+)
6-8 weeks
Powder coat (RAL 7035, UV/sand)
CHINA Same factory
$120
Included
Iris diaphragm hatches (x6)
CHINA Shenzhen precision
$1,400
8-10 weeks
48V 50Ah LiFePO4 battery
CHINA EVE/CATL cells
$620 ($420 at vol)
4-6 weeks
6-port smart charger PCB
CHINA PCBA
$380
6 weeks
X-band FMCW micro-Doppler radar
USA Ainstein / Robin
$3,200
10-12 weeks
RF scanner (2-6 GHz)
USA DroneShield
$1,800
8-10 weeks
EO/IR dual-spectrum camera
USA FLIR / IL Elbit
$1,600
8 weeks
Acoustic MEMS array
EU Infineon
$450
6 weeks
5G/LTE modem + mesh radio
CHINA Quectel + US Digi
$600
4 weeks
Pole collar + wiring + thermal
UAE JAFZA local
$1,100
2-4 weeks
Final assembly, QC, commissioning
UAE JAFZA
$1,300
1 week/batch
$13,500
Type B COGS at 500+ units
35%
Sourced from China
45%
Sourced from US/EU
20%
UAE local (JAFZA)
Business
Unit Economics & 5-Year Projection
$35K
Fully loaded cost per pole
$75K
Sale price per unit
53%
Hardware gross margin
$14K
Annual service contract
Year
Poles
Hardware Rev
Service Rev
Sublease Rev
Total Revenue
EBITDA
Year 1
500
$37.5M
$7M
$0
$44.5M
$18M (40%)
Year 2
2,000
$112.5M
$28M
$5M
$145.5M
$62M (43%)
Year 3
5,000
$225M
$70M
$25M
$320M
$147M (46%)
Year 4
10,000
$375M
$140M
$70M
$585M
$280M (48%)
Year 5
20,000
$750M
$280M
$140M
$1.17B
$584M (50%)
Revenue layer stacking: Hardware sale (one-time) + annual maintenance/replenishment ($8K) + SaaS C2 platform ($6K) + delivery operator sublease ($10K) + police DaaS ($7K) + telecom relay ($4K) = $35,000 recurring revenue per pole per year at maturity.
Structure
The 99-Year Infrastructure Concession
Not a real estate lease. An infrastructure services agreement — the legal backbone of the American Tower model applied to urban airspace.
The Ask: A 50-pole pilot concession in Jebel Ali / JAFZA corridor. $2.5M self-funded investment. Operational within 6 months. Full Dubai (5,000 poles) within 36 months. UAE-wide (20,000 poles) within 60 months. Zero cost to the government.